Crack patch & seal of residential roads throughout the City of Rio Rancho. Hours of operation will be Monday-Friday, 7am-5pm. Construction will resume 10/2/2023 through 11/30/2023.
Traffic control will be limited to 1 lane closure at a time. Residents will have access to their properties at all times during construction.