This project includes the reconstruction of Pinetree Rd. from NM528 Southern Blvd. to St. Andrews Dr., upgrading curb ramps to meet ADA Compliance, new drive pad entrances, replace damaged curb stones, sanitary manhole rehabilitation and the replacement of an existing waterline throughout the project to include new water services.
Currently as part of the Pinetree Reconstruction Project the trees across from the Esther Bone Memorial Library are being removed.
Additional Information:
The southbound lane of Pinetree Rd. will be closed from Oakmount to Southern Blvd. from 11/14/22-11/18/22. Please follow the detour on Oakmount to Country Club Dr. to access Southern Blvd.
Status Log:
November 2022: Removal of trees started and completed.
Adobe Disclaimer: Reading the PDF documents provided on this site requires the Adobe Acrobat Reader, available for free from Adobe. Adobe, the Adobe logo, Acrobat, and the Acrobat logo are trademarks of Adobe Systems Incorporated.